Chapter 9: NO PIE & SIX MONTHS NO SHOWER

Chapter 9: NO PIE & SIX MONTHS NO SHOWER

(09) NO PIE & 6 MONTHS NO SHOWER From Surviving to Living Serial Audiobook https://episodes.castos.com/659ef4b1483350-07089036/1665930/c1e-4p0xgc4934wam5wz4-romjo887f07-paxsjn.mp3 It was January 2012 and I worked in General Assembly inspecting gaskets at base pay,...
Chapter 8: RING TOSS & DOPPELGANGERS

Chapter 8: RING TOSS & DOPPELGANGERS

My job in General Assembly (Rubber) was housed in a large warehouse building shared by several educational and industry job opportunities. There were 2 main jobs – ring inspections and cutting rubber. I was assigned to rings. Base pay was 50 cents. Working rings...
Chapter 7: WoW

Chapter 7: WoW

As I waited to be released from seg, I received a kite (internal institutional mail) from the director of Shakopee’s Women of Wellness program (WoW). She invited me to participate in the six week “in-patient” mental health program. I would be transferred to...
Chapter 2: BAIL, SENTENCING, & PRISON INTAKE

Chapter 2: BAIL, SENTENCING, & PRISON INTAKE

Released on bail after 3 months in jail, Chad arrived to bring me home, telling me in the car, “We’re being evicted and everything has to be out of the house by the end of the day.” At home nothing was packed or ready for a move. We failed to meet the end of...